The Spray booth is a complex of the equipment intended for fast and high-quality drawing, and further and drying, a protective / decorative paint and varnish covering (LKP) on a surface of various products. It provides a constant and even flow of air heated to a given temperature, cleaned of dust and other particles that can damage the coating.
Product type:
Painting cameras
Industry:
For car service For metal structures For railway cars For defense equipment For agricultural machinery
The paint spray booth provides a full cycle of work on the application of paints and varnishes to the surface of various products and their subsequent drying, in compliance with the temperature and time regimes set by the operator.
SPRAY BOOTH FOR PLANTS, METAL WORKSHOPS, FURNITURE PRODUCTION, CAR SERVICES
For all primers, paints, enamels and varnishes
The paint spray booth has an air exchange rate of at least 200 times / hour in painting mode and at least 100 times / hour in drying mode. Due to this, uniform airflow and rapid drying of the painted product is carried out. Also, the camera complies with the European standards for the safety of the operator during painting. Any primers, paints (including water-based), enamels, varnishes and other paints and varnishes can be used in it.
Equipped with an automatic fire extinguishing system;
Made of non-flammable materials;
Explosion-proof design of fans and main elements of the ventilation system;
Automatic safety interlock system – excludes the possibility of supplying paint or compressed air to the devices in case of ventilation interruption.
Paint spray booth
Equipment Configuration of KF Series Chambers
For basic configuration*
Component
KF-4
KF-5
KF-6
Structure
Set of Wall Panels, 50 mm Thick
1 set
1 set
1 set
Entry Gates
1 unit
1 unit
1 unit
Ceiling Structure with Filter Frame Set
1 set
1 set
1 set
Lighting
Set of Ceiling Lights, 4×18 W
6 units
8 units
10 units
Heating System
Diesel, Gas Burner, Electric Heat Exchanger or Water Air Heater
1 unit
1 unit
1 unit
4-Way Stainless Steel Heat Exchanger
1 unit
1 unit
1 unit
Ventilation
Centrifugal Supply Ventilation Unit with Electric Motor
1 unit
1 unit
1 unit
Exhaust Ventilation Cabinet ACC-2.5
1 set
1 set
2 sets
Damper for Manual Air Pressure Adjustment in the Painting Chamber Cabin
1 unit
1 unit
1 unit
Filtration
Set of Exhaust, Supply, and Pre-Filters
1 set
1 set
1 set
Control
Control Panel with Automation and Monitoring Systems
1 unit
1 unit
1 unit
Pressure Gauge for Monitoring Cabin Pressure
1 unit
1 unit
1 unit
Thermostat
1 unit
1 unit
1 unit
Operating Hours Counter
1 unit
1 unit
1 unit
* Configuration is designed for the basic setup. Components may vary depending on specific requirements.
Technical Specifications of KF Series Chambers
For basic configuration*
Parameter
KF-4
KF-5
KF-6
Dimensions**
External Chamber Dimensions (LxWxH)
4.1 × 4.3 × 3 m
5.1 × 5.3 × 3 m
6.1 × 6.3 × 3 m
Internal Chamber Dimensions (LxWxH)
4 × 3 × 2.6 m
5 × 4 × 2.6 m
6 × 5 × 2.6 m
Entry Gates (WxH)
2400 × 2000 mm
2400 × 2000 mm
2400 × 2000 mm
Performance***
Air Flow Capacity
6500 m³/h
8000 m³/h
13000 m³/h
Air Flow Velocity in Working Zone
0.28 m/s
0.28 m/s
0.28 m/s
Air Temperature (set by operator)
16…24 °C
16…24 °C
16…24 °C
Ventilation***
Exhaust Ventilation Unit Power
3 kW
4 kW
2 × 3 kW
Supply Ventilation Unit Power
4 kW
4 kW
5.5 kW
Thermal Power***
Diesel Burner Thermal Power
40–85 kW
60–118 kW
80–160 kW
Gas Burner Thermal Power
35–85 kW
52–103 kW
60–170 kW
Water Air Heater Thermal Power at 90/70 °C
84 kW
91 kW
120 kW
Diesel Fuel Consumption
3.4–7.2 kg/h
5.1–10 kg/h
7–13 kg/h
Natural Gas Consumption
6.4–12.7 m³/h
6.4–12.7 m³/h
6.4–18 m³/h
Heat Carrier Consumption for Calorifer Max at 90/70 °C
3.9 m³/h
4 m³/h
5 m³/h
Electric Heat Exchanger Power Consumption
18–54 kW/h
23–69 kW/h
30–90 kW/h
Electricity***
Total Power Consumption (without Electric Heat Exchanger)
8 kW/h
10 kW/h
14 kW/h
Power Supply
3 phases, 380 V, 50 Hz
3 phases, 380 V, 50 Hz
3 phases, 380 V, 50 Hz
* Specifications are calculated for the basic configuration. Chamber performance significantly increases with the use of optional auxiliary components. ** External chamber dimensions depend on the type and placement of the ventilation unit. *** Fuel consumption depends on the external air temperature. In the basic configuration, air heating can be performed using an electric heat exchanger, gas, or diesel burner (at the customer’s choice).