Pretreatment post: APP SPodium series – solutions for cleaning and pretreatment. The option of installing the post on an all-metal frame-podium provides a rectilinear direction of air movement from top to bottom, due to which a uniform blowing of the entire internal space of the post is performed. Equipped with powerful removal and filtration systems. In operation, dust and polluted air are actively sucked in by the exhaust system and remain within the preparation post. Durable reliable design. Air heating, using a diesel or gas burner. Mounted on a special foundation with ventilation ducts.
For these jobs:
- cleaning;
- grinding;
- putty;
- Primer;
- Polishing.
The use of preparation posts significantly increase the durability of the spray booth filters.
COMPLY WITH INTERNATIONAL SAFETY STANDARDS AND NATIONAL HEALTH AND SAFETY REGULATIONS
- Equipped with an automatic fire extinguishing system;
- Made from non-combustible materials;
- Explosion-proof execution of fans and main elements of the ventilation system;
- Automatic safety blocking system – eliminates the possibility of supplying compressed air to circular devices in case of ventilation failure;
- The ceiling structure is equipped with filter cassettes (class EU5).
SPodium pretreatment post
Equipment Configuration of APP SPodium Preparation Booth
For basic configuration*
| Component | Quantity |
|---|---|
| Structure | |
| Enclosing Curtain with Guides | 1 unit |
| Ceiling Structure with Set of Ceiling Filter Frames | 1 set |
| Set of Floor Grates, Maximum Load 600 kg/200×200 mm | 1 set |
| Lighting | |
| Set of Ceiling Lights, LED T8 1200 mm, 4×18 W | 6 units |
| Ventilation | |
| Centrifugal Ventilation Unit with Electric Motor | 1 unit |
| Pneumatic Damper Device | 1 set |
| Filtration | |
| Set of Exhaust, Supply, and Pre-Filters | 1 set |
| Set of Exhaust Filter Frames | 1 set |
| Control and Monitoring | |
| Control Panel with Automation and Monitoring Systems | 1 unit |
* Configuration is calculated for the basic setup. Components may vary depending on specific requirements.
Technical Specifications of APP SPodium Preparation Booth
For basic configuration*
| Parameter | APP-S-4,0 |
|---|---|
| Dimensions** | |
| External Booth Dimensions (LxWxH) | 7.3 × 4.0 × 3.2 m |
| Internal Working Zone Dimensions (LxWxH) | 6 × 4.0 × 2.6 m |
| Ceiling Structure Dimensions (LxW) | 6000 × 4000 mm |
| Performance*** | |
| Air Flow Rate | 20000 m³/h |
| Air Flow Velocity in Working Zone | 0.25 m/s |
| Ventilation | |
| Exhaust Ventilation Unit Power | 5.5 kW |
| Floor | |
| Maximum Load on Floor Grates | 600 kg/200×200 mm |
| Electricity | |
| Total Power Consumption | 6 kW |
| Power Supply | 3 phases, 380 V, 50 Hz |
* Specifications are calculated for the basic configuration. Booth performance significantly increases with the use of optional auxiliary components.
** External booth dimensions depend on the type and placement of the ventilation unit.
*** Fuel consumption depends on external air temperature (not applicable, as the preparation booth has no heating system).
How to pay
- Cash (when delivered from stores)
- Non-cash payment (for customers)
- Online payment through LiqPau (Privat24/Visa/MasterCard)
Delivery methods:
- Nova Poshta
- Self-pickup
- Transport company
- Delivery
- Intime