The APP FlatFloor series from TWEKO is a modern preparation booth designed for auto repair shops, ensuring a clean and efficient environment for surface preparation before spraying. With an extraction system for spray booths featuring EU3/EU5 dual-stage filtration and installation on any flat floor without additional costs, it boosts productivity in your spray booth. Discover reliable equipment for auto repair shops!
No Additional Costs for Auto Repair Shops
Designed for:
- Cleaning;
- Sanding;
- Filling;
- Priming;
- Polishing.
Using preparation booths significantly extends the lifespan of filters in spray booths, reducing operating costs and enhancing the efficiency of your spray booth.
Compliant with International Safety Standards and Occupational Health Regulations
- Equipped with an automatic fire suppression system;
- Made from non-flammable materials;
- Explosion-proof design for fans and key ventilation system components;
- Automatic shut-off system prevents compressed air supply to circulation equipment if ventilation stops;
- Ceiling structure with EU5 filtration cartridges;
- Energy-efficient LED lighting (8 T8 fixtures, 1200 mm, 4 × 18 W) for optimal visibility.
KEY ADVANTAGE of the APP FlatFloor series is the ability to INSTALL ON ANY FLAT FLOOR, which REQUIRES NO ADDITIONAL COSTS and MINIMIZES CAPITAL EXPENDITURE during workspace setup. If needed, the preparation booth can be easily dismantled and relocated to a new location, ensuring maximum flexibility for your auto repair shop.
Technical Features:
- Airflow: 15,000–18,000 m³/h (depending on model APP-F-35 or APP-F-40).
- Internal work zone dimensions: 6 × 3.5 × 2.6 m (APP-F-35) or 6 × 4 × 2.6 m (APP-F-40).
- Extraction ventilation unit power: 5–5.5 kW.
- Total electricity consumption: 4.6–6.1 kW.
- Flexible ceiling mounting: Cable suspension (for ceilings up to 3 m) or floor-mounted supports.
If you’re looking for reliable and cost-effective equipment for auto repair shops, the APP FlatFloor preparation booth from TWEKO is your best choice. Find out the price of the preparation booth at t-weko.com or contact us: 📞 +380(93) 438 49 89, ✉️ tweko1@gmail.com.
Equipment Configuration of APP FlatFloor Preparation Booth
For basic configuration*
| Component | Quantity |
|---|---|
| Structure | |
| Enclosing Curtain with Guides | 1 unit |
| Ceiling Structure with Set of Ceiling Filter Frames | 1 set |
| Lighting | |
| Set of Ceiling Lights, LED T8 1200 mm, 4×18 W | 6 units |
| Ventilation | |
| Centrifugal Ventilation Unit with Electric Motor | 1 unit |
| Pneumatic Damper Device | 1 set |
| Filtration | |
| Set of Exhaust, Supply, and Pre-Filters | 1 set |
| Set of Exhaust Filter Frames | 1 set |
| Control and Monitoring | |
| Control Panel with Automation and Monitoring Systems | 1 unit |
* Configuration is calculated for the basic setup. Components may vary depending on specific requirements.
Technical Specifications of APP FlatFloor Preparation Booth
For basic configuration*
| Parameter | APP-FF-4,0 |
|---|---|
| Dimensions | |
| External Booth Dimensions (LxWxH) | 7.3 × 4.0 × 3.2 m |
| Internal Working Zone Dimensions (LxWxH) | 6 × 4.0 × 2.6 m |
| Ceiling Structure Dimensions (LxW) | 6000 × 4000 mm |
| Performance | |
| Air Flow Rate | 20000 m³/h |
| Air Flow Velocity in Working Zone | 0.25 m/s |
| Ventilation | |
| Exhaust Ventilation Unit Power | 5.5 kW |
| Electricity | |
| Total Power Consumption | 6 kW |
| Power Supply | 3 phases, 380 V, 50 Hz |
* Specifications are calculated for the basic configuration. Booth performance significantly increases with the use of optional auxiliary components.
** External booth dimensions depend on the type and placement of the ventilation unit.
*** Fuel consumption depends on external air temperature (not applicable, as the preparation booth has no heating system).
How to pay
- Cash (when delivered from stores)
- Non-cash payment (for customers)
- Online payment through LiqPau (Privat24/Visa/MasterCard)
Delivery methods:
- Nova Poshta
- Self-pickup
- Transport company
- Delivery
- Intime